Technical emergency · Maestro Rescue

Stabilise your application before the next incident

I analyse, corrects and documents Next.js and TypeScript applications that are weakened by a blocking bug, migration, broken deployment or technical debt that has become critical.

Interactive demonstration

See an application resume becoming readable and manageable.

Explore a stabilization dashboard designed to track incidents, priorities, fixes and return to a healthy state.
  • Demonstration data
  • Interactive course
  • Opening in a new tab
Open Rescue SaaS DashboardAccess the demonstration

01 / Finding

Fixing fast must not create the next problem

A serious recovery begins by securing the current state, reproducing the incident and distinguishing the symptom from the cause. The intervention plan protects the service before improving the code.

  • Blocking error in production
  • Build or deployment impossible
  • Regression after updating
  • Degraded loading time
  • Obsolete or vulnerable dependency
  • Code without testing or documentation

02 / Applications

An intervention adapted to the actual nature of the incident

01

Production blocked

Reproduce, isolate and correct a route that prevents activity.

  • Runtime error
  • API unavailable
  • Payment blocked
  • Hotfix controlled
02

Build and deployment

Restore a reliable build chain and production.

  • CI/CD
  • Variables
  • Vercel
  • Docker
03

Migration Next.js

Pass a critical version without breaking roads, data or components.

  • App Router
  • React
  • Dependencies
  • Controlled codemods
04

Performance

Treat technical causes that slow down experience and conversion.

  • LCP
  • INP
  • Images
  • Bundles
05

Application security

Correct the configuration, access or validation flaws observed.

  • Auth
  • Permissions
  • Secrets
  • Validation
06

Technical debt

Separate useful refactors from risky and costly rewrites.

  • Architecture
  • Tests
  • Types
  • Documentation

03 / Standard Maestro

Successful recovery leaves a more understandable application than before

Each correction is linked to a cause, test and delivery note. Risk changes are isolated, backlashes are possible and priorities are discussed before the intervention.

  1. 01

    Reproduction before correction

  2. 02

    Backup and Rollback

  3. 03

    Limited and re-read patch

  4. 04

    Non-regression tests

  5. 05

    Change log

  6. 06

    Audited Dependencies

  7. 07

    Post-deployment monitoring

  8. 08

    Residual debt plan

04 / Offers

A clear level of response depending on the urgency and depth

Priority diagnosis

490 € excl. VAT

Get a reproduction, cause analysis and a costed intervention plan.

  • Review of the deposit
  • Reproduction
  • Log analysis
  • Correction plan

First analysis within 24 to 48 hours

Start diagnosis

Priority intervention

From 1 490 € excl. VAT

Correct a well-identified incident with a short delivery window.

  • Priority period
  • Correction
  • Targeted test
  • Emplacement with accompanying personnel

2-3 working days

Reserve intervention
Most requested

Sprint of stabilization

From 3 900 € excl. VAT

Treat several related causes and return critical pathways to control.

  • Targeted audit
  • Priority corrections
  • Tests
  • Monitoring and handover

5 to 8 working days

Schedule sprint

Application recovery

From 6 900 € excl. VAT

Take a fragile base back, migrate critical parts and restore a sustainable base.

  • Target architecture
  • Progressive migration
  • Critical tests
  • Full documentation

2 to 6 weeks

Study recovery

05 / Continuity

Notify the next emergency with adapted continuity

Corrective watch

390 € excl. VAT / month

  • Grouped updates
  • Monthly review
  • 1 hour corrective included
Select the previous day
Continuity

Active maintenance

€790 excl. VAT / month

  • Monitoring
  • Updates
  • 4 hours corrective
  • Monthly report
Secure application

Enhanced priority

1 490 € excl. VAT/month

  • Priority channel
  • 8 a.m. corrective
  • Performance review
  • Quarterly plan
Requesting priority

06 / Method

A visible progression, from framing to production

  1. 01

    Qualification

    Impact, affected users, time frame and access available.

  2. 02

    Security

    Backup, environment, branch and strategy of rollback.

  3. 03

    Reproduction

    Accurate scenario, logs, data and trigger conditions.

  4. 04

    Correction

    Minimum Patch or Refactor set according to confirmed cause.

  5. 05

    Validation

    Non-regression tests and verification of neighbouring routes.

  6. 06

    Delivery

    Deployment, monitoring, documentation and residual debt.

The emergency remains governed by safeguards

Access is limited, changes can be traced and deployment can continue to be a return route. Urgent intervention never justifies weakening essential controls.

  • Temporary access
  • Unshared secrets
  • Dedicated Branch
  • Pull request reread
  • Rollback prepared
  • Logs after delivery

Selected technologies as required

  • Next.js
  • React
  • TypeScript
  • Node.js
  • PostgreSQL
  • Supabase
  • Vercel
  • Docker
  • GitHub Actions
  • Sentry
  • Playwright

Frequently Asked Questions

The answers before starting

Can you intervene immediately?

The first step is a quick qualification. The actual time frame depends on access, reproducibility, risk and ongoing commitments. No correction is promised before this analysis.

Are you working on a code you haven't developed?

Yes, if deposition, environments and dependencies allow a reasonable recovery. The diagnosis confirms this point before any commitment.

Is the diagnosis derived from the intervention?

It can be integrated into the overall budget when the intervention is immediately confirmed, depending on the scope of the proposal.

Can you correct it without rewriting it all?

This is the objective. Rewriting is proposed only if the local correction creates more risk or cost than a progressive migration.

What do you provide after the correction?

A summary of the cause, changes made, tests, monitoring points and remaining recommendations.

Next step

Describe the impact before describing the solution

Indicate the symptom, the environment, the number of users affected and the deadline. You will receive a first orientation within 24 hours.

Request a diagnosis